Chris O'Leary's avatar

Chris O'Leary

@ohhleary.bsky.social

I mean, bringing equipment building in-house is exactly what the MTA should be doing. It cuts costs over using an outside vendor. So would bringing design and construction in house for capital projects, but without a robust capital budget, there's no reason to do that.

1 replies 0 reposts 0 likes


K. H. I.'s avatar K. H. I. @sheridesabike.bsky.social
[ View ]

Ah, I assumed you were raising the in-house issue as problematic otherwise

1 replies 0 reposts 1 likes