|
Ben Lever@simbera.bsky.social |
I recently listened to this @volts.wtf podcast on "reconductoring" - hanging new, better wires on existing transmission towers to boost capacity.
I'm wondering if this is applicable in Australia, and might reduce the fights we're having over new transmission? www.volts.wtf/p/one-easy-w...
0 replies 4 reposts 12 likes